Macau – Cotai Construction in Photos – Studio City, The Parisian, Galaxy Phase 2 and Sands Cotai

Studio City under Construction

There are several new mega casino resorts under way in Cotai and here are a few construction progress photos of them. Above and below you can see Studio City, the new Melco-Crown enterprise at Cotai, which is in a similar state as Galaxy Macau Phase 2 several months ago: The facade is coming up and I believe that fit out has started on the podium and lower tower floors. From the numbers displayed on the floors we are talking about two towers with each 30 floors.

Studio City Construction 2014-09-14

Studio City Construction 2014-09-14

Galaxy Macau Phase 2, as already seen in the last posts, is in pretty good shape with facade nearly completed.

Galaxy Phase 2 Construction 2014-09-15

Galaxy Phase 2 Construction 2014-09-15

Galaxy Phase 2 Construction 2014-09-15

Sands is further working on their Tower 4 of Sands Cotai Central.

Sands Cotai Central Tower 4 Construction 2014-09-14

An impression from The Parisian, after its recent stop and resume of construction works, most likely linked to missing (or incomplete) construction permits.

The Parisian Construction 2014-09-15

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s